Most projects do not fail because of bad code. They fail because nobody agreed on what was being built. So before we write a line of it, we spend a week on scope. Here is what that week looks like.
Day 1: Listen
We ask the same three questions every time: who is this for, what changes for them when it works, and what happens if we do nothing? The answers fit on half a page, and that page becomes the reference for everything after.
Day 2: Map the journey
We sketch the main flows on paper: sign up, do the main thing, get the result. If a flow takes more than six steps on paper, it will feel longer on a phone, so we cut it down now.
Day 3: List what is out
A good scope says what is not included. We write a short "not now" list together, and it is often the most useful page in the document.
What goes on the list
- Features that depend on data you do not have yet
- Integrations that can wait for version two
- Anything nobody on the team can describe in one sentence
Day 4: Estimate in ranges
We give ranges, not single numbers, and we say what could move them. A range with reasons is more honest than a precise figure nobody believes.
A scope is a promise about what you will not be surprised by.
Day 5: Read it back
We read the scope back to you in plain language. If something sounds wrong out loud, we fix it before it becomes code. Then, and only then, we plan the first release.